Permits, interconnection, HOA rules and insurance

HomeBackupPros does not check or enforce any of these. Here is what to ask about, and who usually handles it.

Licenses

North Carolina requires an electrical contractor license for solar installs of any size. Larger jobs with structural work may also need a licensed general contractor. Ask for license numbers and look them up with the NC licensing boards.

Permits and inspections

Solar, battery and generator installs need permits from your county or city inspections department and a final inspection. Your contractor normally pulls them. Ask to see the permit before work starts.

Utility interconnection

A system that connects to the grid needs your utility's approval before it is turned on. Duke Energy, the electric cooperatives, the town-owned systems and the TVA area utilities each have their own application and their own way of crediting what you send back. See our power company pages for the basics on yours.

HOA rules

If you are in an HOA, read the covenants and ask about any approval process for roof or ground equipment before you sign a contract.

Insurance

Ask your contractor for a certificate of liability insurance. Call your own insurance agent before the install to ask how the new equipment is covered under your homeowners policy.

Generators

Standby generators need a transfer switch, clearance from windows and doors, and a fuel connection done to code. Never backfeed a house with a portable generator through an outlet.